About us
JOHN BEGANI
Owner/Operator
Over 40 years of pre-construction estimation experience
Industry-leading margin of error of less than 3%
Taking the mystery out of pre-construction estimation for over 40 years.
So you can focus on what matters most.
John Begani brings 40 years in the Pre-Construction Process. He has an Associate Degree in Applied Science in Construction Technical Engineering from the State University of New York, Canton ATC.
Being a Member of the American Society of Professional Estimators (ASPE) and a proven leader in preconstruction with experience ranging from healthcare; hotel and residential; science buildings; sports stadiums; K-12 education; higher education; aviation; and office retail.
He knows the market, and his relationship with the trade contractors brings value to the Team. His passion and vision include a distinguished record of success and experience, rare in the preconstruction field.
Selection of previous projects
Naples Botanical Gardens Evanstad Campus, Naples FL
$14.2 million, Maintenance and Office Buildings with (2) Orchid Greenhouses, RO System / Generator Building, Potting Shed and Irrigation Building for staff on existing Nable Botanical Gardens. Extensive sitework and site utilities.
Marco Island Fire and Resue Station #50, Marco Island FL
$12.5 million, 24,000 sf Two-story fire station, emergency operations center and office building constructed to resist 200 mph wind load. Building will be self-sufficient with full generator power for no less than four consecutive days. Project includes new fuel storage and dispensing area with the capability of holding a total of 8,000 gallons of fuel.
Marco Island Veteran’s Community Park, Marco Island FL
$12.0 million City Park complete with unique Amphitheater, Restroom Building, Memorial Gardens, Famers Market and Event Lawn
RSW Terminal Expansion, Ft Myers FL
$225.0 million, Expansion to RSW Airport. Based on 5-phases of construction (36-months) through an active airport.
RSW Passenger Boarding Bridges, Ft Myers FL
$45.0 million, 27-new Passenger Boarding Bridges replacing the existing bridges.
LCPA Ticket Counter Casework Renovation, Ft Myers FL
$5.0 million Millwork / Casework renovation to existing Ticket Counters / Gate Check in Counter. Including LCD Displays and low voltage / electrical connections
Florida Gulf Coast University Academic Building 9 (FGCU AB9)
$49.9 million, 114,512 sf Classroom and Wet Laboratory Building. Project is a lab / science building to help control blue-green algae / red tide. Complex structural steel / precast concrete cladding / curtainwall, casework and wet labs
Artis Baker Museum Renovation & Expansion
$20.6 million, 20,330 sf renovation and expansion to Artis Naples Baker Museum. Project is high profile complex structural steel / imported stone cladding / curtainwall
Collier County Sports Complex, Naples FL
$90.0 million sports complex comprised of semi-pro style synthetic turf fields, fully sports lighted fields, 6,000 seat stadium, concessions / administration and restroom buildings
Healthcare Networks of SW Florida Community Health Center, Naples FL
$14.2 million 54,317 sf Healthcare Network is a medical and dental home, where community can receive patient-centered services.
Ave Maria Mother Teresa Building, Immokalee FL
$7.5 million 38,000 sf university classroom and small performance room to Ave Maria University
Baker Park Phase I and II, Naples FL
$15.0 million City Park with Amphitheater, Multipurpose Building, IPE Boardwalks, Boat Dock, Canoe Launch
Azure of Palm Coast, Palm Bay FL
$21.7 million, 103,328 sf/ 112 unit Assisted Living Facility constructed per ACHA requirements and a CMU block and hollow core plank construction
The Preserve, Estero FL
$22.0 million 132,313-sf Assisted Living Facility constructed per ACHA requirements and a CMU block and hollow core plank construction
The Waters of Cape Coral, Cape Coral FL
$16.0 million, 83,500 sf/ 98 unit Assisted Living Facility constructed per ACHA requirements and a CMU block and hollow core plank construction
Community School of Naples (CSN) STEM Building, Naples FL
$7.4 million, 26,057-sf Private High School Science Classroom Building. Load bearing CMU / Composite Steel Framing High School Science / Lab Building
City of Naples Fire Station 1, Naples FL
$8.7 million, 22,598-sf Fire Station and EOC Building. Built to withstand category 5 hurricanes
Office Building and Parking Garage, Naples, FL
$11.8 million, 4-story office complex totaling 60,000 sqft with a detached parking deck / garage totaling 40,000 sqft
Luminary Hotel, Ft Myers, FL
$41.0 million, 12-story hotel / 205,000 sqft / 238-keys 4-star hotel in downtown Ft Myers with a 3-story parking garage at 109,000 sqft / 223 spaces. Includes 3-kitchens and a demonstration kitchen / retail along main street and a roof top lounge
Gordon River Bridge and Boardwalk, City of Naples, FL
330-lnft Pedestrian IPE Boardwalk spanning the Gordon River, includes a Pavilion over the waterway, IPE decking and construction and lighting / navigational lighting
Tampa Bay Buccaneers Raymond James Stadium
$280.0 million suites and locker room modification and renovations
Wyndham Grand Resort, Clearwater Beach, FL
$90 million, 450 rooms in two 15-story towers, and 24,000 square feet of event space.
Pinellas County Jail Infrastructure Phase I, Clearwater, FL
$87 million, Infrastructure building to house laundry and food service for entire campus as well new HVAC equipment and chilled water loop for campus; new facilities maintenance building.
Opal Sands Resort, Clearwater Beach, FL
$60 million, 230 guest rooms and suites, all with private gulf front balconies. Large fitness center, Full-service spa. Waterfront dining and beach bar. Retail Shops, 25,000 sq. ft. of indoor and outdoor event space, 5,500 sq. ft. event lawn for elegant outdoor affairs
Edgewater Beach Boutique Hotel, Treasure Island, FL
$25 million, 77 guest rooms with suites all with views to the Gulf of Mexico
TCAT Nissan, Nashville, TN
The $35 million training center will provide training programs to prepare workers for jobs in advanced manufacturing such as robotics and manufacturing maintenance. The training center will operate as an extension of the TCAT campus in Murfreesboro. Nissan and TCAT will occupy the facility jointly.
University Medical Center, New Orleans, LA
$700 million, >2.0 million-SF, contains 2-blocks of new Patient Tower building, Emergency Rooms building, Out-Patient Buildings, Parking Garage in downtown New Orleans.
PHCC Porter Campus at Wiregrass, Wesley PHCC Porter Campus at Wiregrass, Wesley Chapel, FL
$45 million, 118,000-SF, contains 2-1/2 story cast in place concrete parking garage with 4-buildings atop of the top deck of parking. A 4-story classroom building, 2-story library, 2-story administrative area and a 1-story bookstore / common area for students.
PHCC Spring Hill Campus, Spring Hill, FL
$30 million new campus, several buildings
University of Miami, Patricia Frost School of Music & Foster Building Renovation, Coral Gables, FL
$18 million, 65,000-SF, contains two new building constructed on either end of the existing Foster Building containing sound studios for Deans and Professor for individual studies with music students. Renovation of the existing Foster Building to meet current demand for eight additional sound studios as well as tie-in of new construction.
City of Tampa Museum of art Downtown Waterfront Park, and Kiley Gardens
Repair, Tampa, FL
$40 million, 85,000-SF, new museum facility, nine-acre redesigned waterfront park and riverwalk.
University of South Florida, Visual and Performing Arts, Tampa, FL
$35 million, 113,000-SF, contains several acoustically sensitive and specialized music related areas including: a multi-discipline recital hall, a choral rehearsal room, instrumental rehearsal room, jazz rehearsal room and an electronic music studio all of which will be balanced for recording purposes. Additionally, the facility will house a multitude of practice rooms, dedicated music teaching rooms along with faculty studios and faculty offices. The 500-seat concert hall will not only be used for student and faculty musical presentations, but for various performers who will be brought in to the facility.
Baptist Health South Florida Hospital, Homestead, FL
$82.4 million, 392,000-SF, 120-bed, five-story new replacement hospital on a 63-acre greenfield site. The new CEP includes a pair of 300hp boilers, three 800-ton centrifugal chillers and a pair of
1500kw emergency generators. Designed and built to withstand a category five hurricane.
Hernando County School Board, High School “EEE”, Brooksville, FL
$50 million 230,000-SF, new 2,000-student high school. Two-story, tilt-wall construction consisting of three education pods, an administration/media building and an auditorium/cafeteria/ gymnasium building. Also includes a new central energy plant, sports fields, and football stadium.
The Ohio State University, Columbus, OH
Various Projects over a 7-year period totaling $750 million
Honda Engine Plant, Anna, OH
Various affiliate that provided parts to Honda Engine
Honda Assembly Plant, Marysville, OH
Techniglass, Columbus, OH
The Timken Company, Columbus, OH
Getting your project on a budget ahead of time is easy:
Define
Let's define and review everything about the scope of your project.
Review
We create a complete fee proposal and specifications review.
Build
You start building with confidence, knowing that the numbers add up.